ID # | 837951 |
房資料 | 5房, 3浴, 半浴, 洗碗機, 洗衣機, 車庫, 空調, 3300 ft2 室內尺, 室內307m2平方米 上市時間: 16天 |
建造年份 | 2025年 |
地稅 | $3萬4 ($34,000) |
空調 | 中央空調 Central Air |
地下室 | 全地下室 Full basement |
![]() |
這棟新建住宅提供5間臥室、3個全浴室和1個半浴室,擁有超過3,300平方英尺的精心設計居住空間。開放式概念廚房配備白色 shaker 設計櫥櫃、石英櫃檯和不鏽鋼家電,流暢地通往一個充滿自然光的客廳,裡面有電壁爐和嵌入式照明。室內整個主層和樓上臥室採用4英寸硬木地板,所有浴室均鋪有陶瓷瓷磚,第五間臥室/附加房間則鋪設地毯。
主套房設計以放鬆為主,提供加熱地磚、雙洗手台和瓷磚淋浴圍牆,帶來像水療一樣的體驗。為了提高效率,這棟住宅配備噴泡保溫材料、3區域SEER等級的熱泵和中央空調。外部裝修包括白色的木板和闊縫乙烯基壁板、安德森400系列窗戶,以及帶有金屬屋頂飾件的建築用瓦片。該房產位於Somers學區的1.05英畝土地上,設有瀝青車道、藍石步道和寬敞的12' x 16'後陽台。
完整的步入式地下室包括為未來全浴室預留的粗略管道,提供了良好的擴展潛力。擁有3車位的車庫和高端的內部裝修,這棟住宅在一個受歡迎的地點融合了舒適、風格和多功能性。方便地靠近I-684、塔科尼克州立公路和Metro-North火車站。建設於2025年3月開始,並計劃於9月初完成。
This new construction home offers 5 bedrooms, 3 full and 1 half baths, and over 3,300 sq ft of thoughtfully designed living space. The open-concept kitchen boasts white shaker cabinetry, quartz countertops, and stainless steel appliances, flowing into a light-filled living area with an electric fireplace and recessed lighting. The interior features 4” hardwood flooring throughout the main level and upstairs bedrooms, with ceramic tile in all baths and carpeting in the fifth bedroom/bonus room.
The primary suite is designed for relaxation, offering heated tile floors, a double vanity, and a tiled shower surround for a spa-like experience. For efficiency, the home is equipped with spray foam insulation, a 3-zone SEER-rated heat pump, and central AC. Exterior finishes include white board and batten vinyl siding, Anderson 400 Series windows, and architectural shingles with metal roof accents. The property sits on a 1.05-acre lot in the Somers School District and features a blacktop driveway, bluestone walkway, and a spacious 12’ x 16’ rear deck.
The full walk-out basement includes roughed-in plumbing for a future full bath, providing great expansion potential. With a 3-car garage and high-end finishes throughout, this home blends comfort, style, and versatility in a sought-after location. Conveniently located close to I-684, the Taconic State Parkway, and the Metro-North train station. Construction began in March 2025 and is on schedule for completion by early September. © 2025 OneKey™ MLS, LLC